This project is about the construction of an elevator shaft to replace the existing staircase and provide access to the underpass. The shaft was made of surface components consisting of reinforced concrete, ensuring its stability and durability with control of cracking at the same time.
Our client, Maderas Besteiro, was in charge of drafting this emblematic project (structural analysis and design), involving the manufacture of all pieces, a numerical control, subsequent treatment, and finally, assembly management.
This hydraulic dam project, located in the Provence-Alpes-Côte d'Azur region (PACA), included design consideration for the control valve’s rotational axis deformation, maximum stress, and material fatigue behavior.
The sluice gate is based on a pressure segment used to control the water level of the weir. The flap width is 23 ft, the total width of the structure is 34 ft. It is possible to dam water to a maximum height of 18 ft. The structure is made of S 355 steel.